PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd floor interior metal framing Facing East.jpg Door frames at the 3rd floor Facing West.jpg Instaling waste and vent piping at the 3rd floor Facing North.jpg Installed electrical wiring at the 2nd floor door frames 1.jpg Installed electrical wiring at the 2nd floor door frames 2.jpg
Next page 3rd floor interior metal framing Facing East
3rd floor interior metal framing Facing East